A PreProcessor for a Plan. PreProcessors are allowed to add steps to the very beginning of a plan.
 These added steps will only be ordered relative to all the steps added by 
PrePlanProcessors, not with respect to all the steps in the plan.
 PreProcessors are executed in an ordered fashion. Their ordering is the following:
 
     - A lower 
order() god before a higher order (default 100). 
     - Same orders are ordered alphabetically by 
Class.getSimpleName() of the class of the annotated PreProcessor. 
     - Same class names are ordered by 
Method.getName() of the annotated method 
 
 
 A method annotated with 
PrePlanProcessor should take the following parameters:
 
     DeltaSpecification The specification for the current deployment
 
 The method should return either a 
DeploymentStep or a 
List of 
DeploymentStep.
 The class that contains this annotated method should have a default or no-arg constructor.