A PostProcessor for a Plan. PostProcessors are allowed to add steps to the very end of a plan.
These added steps will only be ordered relative to all the steps added by
PostPlanProcessor
s, not with respect to all the steps in the plan.
PostProcessors are executed in an ordered fashion. Their ordering is the following:
- A lower
order()
god before a higher order (default 100).
- Same orders are ordered alphabetically by
Class.getSimpleName()
of the class of the annotated PostProcessor.
- Same class names are ordered by
Method.getName()
of the annotated method
A method annotated with
PostPlanProcessor
should take the following parameters: